Accumulate each development’s costs separately, assessing every expense against its project connection and stage. Production cost, period expense and tax-deductible cost may be recognised differently. The Accounting Act and adopted policy provide the basis; KSR 8 explains these principles.
Contents
Land before and after project commencement
KSR 8 distinguishes land bought for a specific project, investment property and own fixed assets. Actual intended use, valuation policy and change date determine classification. Sections 7.2–7.5 explain reclassification and transfer to work in progress after project commencement.
Next step: Document intention, commencement and the value used on reclassification.
Construction, shared costs and units
Allocate justified materials, design, contractors and production overheads under the Accounting Act. Maintain separate tasks and phases with allocation drivers reflecting the real cost connection. Using a general contractor still requires the developer’s own project accounting.
At completion, establish unit values, cost of sold portions and remaining stock. Warranty, defect liability and committed future works may require estimates and appropriate recognition.
Next step: Reconcile project costs to units, evidence and the updated cost-to-complete budget.
Interest and property tax have conditions
Under KSR 8 sections 7.6–7.8, financing costs and property tax or perpetual-usufruct fees between commencement and completion may increase project cost on the applicable basis. This needs an accounting-policy choice applied to all developments; shared borrowing requires allocation and relevant financing income is accounted for accordingly.
Pre-commencement property tax and fees are period expenses. Distinguish technological pauses from stoppages caused by finance or material shortages: section 7.9 gives different treatment to interruption costs.
Next step: Connect costs to dates, finance sources and each stoppage’s cause.
Period expenses, losses and tax
Selling, marketing, specified administration and entity-running costs generally affect the period under KSR 8; a project company does not automatically capitalise every expense. Expected losses require impairment and obligation assessment, with PIT/CIT consequences determined separately.
An own-use construction investment differs from units for sale. Property VAT and tax cash flows also have separate rules.
Next step: Review period costs, write-downs, estimates and tax differences at closing.
Working with BTLA BPO
Prepare policy, land and project records, budget, timetable, finance, sales register and post-handover obligations. Agree classification approvals, cost reporting and liquidity within accounting support. See the overall developer accounting guide. Request a scope quote.
Next step: Reconcile one project from purchase evidence to the cost of a sold unit.
Common mistakes
Do not treat a policy clause alone as permission to capitalise every expense or KSR 8 as a tax-deduction rule. Commencement, completion and stoppage causes affect the assessment.
Next step: Check legal basis, stage and purpose for every cost category.
Sources and review date
Reviewed on 24 November 2026. This material concerns Polish law. The original publication date is preserved.
Next step: Check the legislation and records applicable to the period being settled.


